Preliminary discussion on decision-making ability of operators in nuclear power plants in China |
CUI Ran, LIU Yulong, HOU Yuhan, WANG Ruihao, WANG Min, DU Yun, YAO Zhen |
The Second Affiliated Hospital of Soochow University, Suzhou 215004 China |
|
|
Abstract Objective To study the decision-making ability and correlation analysis of Chinese nuclear power plant operators. Methods Cluster sampling method was applied And 500 control personnel was randomly selected in seven CGNPC group subordinate station plant, "Mental Health and Neurobehavioral Evaluation System of Version2.0" was used to assess the psychosomatic health status, and record the decision-making ability score, analysis the age, seniority, education level, marital status, etc. Results The masked factor (Li) in this study was less than 8 points, indicating that the test results were reliable. Age and seniority can affect the mean of decision-making ability, and the difference between education degree and marital status is not statistically significant. Conclusion China's nuclear power plant operators have good decision-making ability, strong decision-making ability and good self-management ability, but there are differences in age and seniority.
|
Received: 12 March 2018
|
|
|
|
|
[1] 何旭洪,高佳,黄祥瑞.核电厂操纵员执业适宜性研究[J].原子能科学技术,2006,40(3):321-325. [2] Devitacochrane C.Personality Factors and Nuclear Power Plant Operators:Initial License Success[M].Dissertations.&Theses-Cradworks.ISBN:9781339397191,2015. [3] 李丹丹. 青少年精神分裂症患者心理理论和决策能力研究[D].合肥:安徽医科大学,2015:1-50. [4] 王玉堂.决策:领导工作的起点[J].决策与信息(上旬刊),2016(12):38-41. [5] 李元,孙义玲,刘玉龙,等. 中国核电厂操纵员心理健康初步调查和分析[J].辐射防护通讯,2010,30(5):18-21. [6] 毕金玲,刘玉龙,李元,等. 中国核电厂操纵员心身健康的初步报告[J].中华放射医学和防护杂志,2011,31(3):101-104. [7] 孙义玲,刘玉龙,李元,等.中国核电厂操纵人员明尼苏达多相人格问卷的测评分析[J].中华放射医学与防护杂志,2011,31(2):90-93. [8] 戴婷婷,刘玉龙,李元,等.核电厂操纵人员心理健康相关因子的初步研究[J].中华放射医学与防护杂志,2012,32(2):123-126. [9] 王莉. 企业激励机制中的年龄问题研究[J].社科纵横,2009,25(9):36-38. [10] 周华云.核电厂操纵员的心理健康与事故预防[J].核安全,2004,2(2):33-38. [11] 陆萍,李敏,吴正言,等.核电厂操纵员整合性心理干预前后的对比[J].辐射防护通讯,2016,36(5):41-44. [12] 黄卫刚,张力.大亚湾核电站人因事件分析与预防对策[J].核动力工程,1998,19(1):64-67. |
|
|
|