Improvement and application of radiation work permit software in nuclear power plants |
PAN Tongjin, LI Zhonghua, CHEN Hao |
Jiangsu Nuclear Power Co. LTD, Lianyungang 222000 China |
|
|
Abstract Objective To improve the efficiency of radiation work preparation, promote the comprehensive and whole-process control of radiation risk, strengthen the accumulation of experience feedback data, and improve the timeliness of approval. Methods According to the application of radiation work permits in Tianwan Nuclear Power Plant and other nuclear power plants, the radiation work permit software in Tianwan Nuclear Power Plant was improved in terms of work order connection, examination and approval process integration, approval of radiation work at different levels, unification of level classification standard, radiation risk database establishment and maintenance, and closed loop management and mobile approval of radiation work permit. Results A radiation work permit software for nuclear power plant was developed according to the requirement of radiation risk control. Conclusion The radiation work permit software effectively improves the radiation work regarding work preparation efficiency, risk control, experience feedback data accumulation, and timeliness of approval. Subsequently, information transmission efficiency and experience sharing can be improved through connection and communication with other software in nuclear power plants.
|
Received: 11 August 2021
|
|
|
|
|
[1] 国家能源局. NB/T 20443—2017核电厂运行辐射防护规定[S]. 北京: 原子能出版社, 2017. National Energy Administration. NB/T 20443—2017 Regulations on radiation protection in operation of nuclear power plants[S]. Beijing: Atomic Energy Press, 2017. [2] 王川. 压水堆核电站辐射防护规范化管理研究[D]. 上海: 上海交通大学, 2007. Wang C. The research about standardization management of radiation protection in pressurized water reactor power plant[D]. Shanghai: Shanghai Jiao Tong University, 2007. [3] 王川, 张强, 曾进忠, 等. 核电站辐射防护管理中的五个核心问题[J]. 中国辐射卫生,2018,27(6):614-617. DOI: 10.13491/j.issn.1004-714X.2018.06.027 Wang C, Zhang Q, Zeng JZ, et al. Five core issues in radiation protection management of nuclear power plant[J]. Chin J Radiol Health, 2018, 27(6): 614-617. DOI: 10.13491/j.issn.1004-714X.2018.06.027 [4] 王孔钊, 戈建安, 徐侃. 核电站辐射工作分级管理初步探讨[J]. 辐射防护通讯,2008,28(1):15-19. DOI: 10.3969/j.issn.1004-6356.2008.01.003 Wang KZ, Ge JN, Xu K. On practices in graded radiation management at QNNP Ⅲ[J]. Radiat Prot Bull, 2008, 28(1): 15-19. DOI: 10.3969/j.issn.1004-6356.2008.01.003 [5] 曾玉, 郑文君. 昌江核电厂辐射工作分级管理探索[J]. 产业与科技论坛,2016,15(22):64-65. DOI: 10.3969/j.issn.1673-5641.2016.22.033 Zeng Y, Zheng WJ. Exploration on the classification management of radiation work in Changjiang Nuclear Power Plant[J]. Ind Sci Tribune, 2016, 15(22): 64-65. DOI: 10.3969/j.issn.1673-5641.2016.22.033 [6] 苏成杰, 高涵. 辐射工作许可证在核电站辐射防护管理中的应用[J]. 辐射防护通讯,2017,37(3):9-13. DOI: 10.3969/j.issn.1004-6356.2017.03.003 Su CJ, Gao H. Analysis of the application about the radiation work permit (RWP) in radiation protection management[J]. Radiat Prot Bull, 2017, 37(3): 9-13. DOI: 10.3969/j.issn.1004-6356.2017.03.003 [7] 国家能源局. NB/T 20185—2012 压水堆核动力厂厂内辐射分区设计准则[S]. 北京: 原子能出版社, 2013. National Energy Administration. NB/T 20185—2012 Design criteria of radiation zoning inside of the PWR nuclear power plant[S]. Beijing: Atomic Press, 2013. [8] 阎玉奎, 邓纪琴, 张文宇. 放射源安全管理现状与建议[J]. 中国辐射卫生,2003,12(2):75-76. DOI: 10.3969/j.issn.1004-714X.2003.02.006 Yan YK, Deng JQ, Zhang WY. Status of safety management of radioactive sources and suggestions[J]. Chin J Radiol Health, 2003, 12(2): 75-76. DOI: 10.3969/j.issn.1004-714X.2003.02.006 [9] 李雪琴, 曹吉生, 张伟军. 浅谈辐射安全与防护管理工作[J]. 中国辐射卫生,2011,20(3):279-280. DOI: 10.13491/j.cnki.issn.1004-714x.2011.03.002 Li XQ, Cao JS, Zhang WJ. A brief discussion on radiation safety and protection management[J]. Chin J Radiol Health, 2011, 20(3): 279-280. DOI: 10.13491/j.cnki.issn.1004-714x.2011.03.002 [10] 吴宜灿. 辐射安全与防护[M]. 合肥: 中国科学技术大学出版社, 2017: 197-219. Wu YC. Radiation safety and protection[M]. Hefei: University of Science and Technology of China Press, 2017: 197-219.
|
|
|
|